Project Description 
 
The 2027 Pavement Preservation Project will help extend the life of existing roads in residential neighborhoods within the area bounded by East Avenue, Manzanita Avenue, North Avenue, and Ceanothus Avenue (see Project Location Map). Depending on the condition of each road, crews will apply a protective surface treatment called a slurry seal or cape seal to help preserve the existing pavement and slow deterioration. Streets that are too deteriorated for these treatments will be milled down and resurfaced with a new layer of asphalt. 
 
The project is funded by Measure H and other local funding sources. 
 